ETAITECH

Production Process - ETAITECH
01
Incoming Material Inspection
1.Material Requirements
2.Restricted Substance Requirements
3.Flame Retardancy Requirements
4.Appearance Requirements
5.Dimensional Requirements
6.Performance Requirements
02
Material Loading and Assembly
1.Appearance Self-Inspection
2.Correct Assembly
3.Cleaning and Protection
4.Dual Aluminum Busbar Prevention and Control
5.Traceability Binding
03
Hot-Riveting Fixation
1.Assembly Inspection
2.Gentle Handling
3.Rivet Point Self-Inspection
4.Cleaning and Protection
04
Laser Welding
1.Riveting Fixation Inspection
2.Gentle and Stable Handling
3.Weld Point Self-Inspection
4.Cleaning and Protection
5.Critical Workstation
05
Electrical Performance Testing
1.Welding Inspection
2.Gentle and Stable Handling
3.Monitoring of Testing Status
4.Cleaning and Protection
5.Critical Workstation
06
AOI and Visual Inspection
1.Gentle and Stable Handling
2.Monitoring of Testing Status
3.Visual Appearance Inspection
4.Cleaning and Protection
07
Packaging and Shipment
1.Dust Protection
2.Appearance Cleaning
3.Barcode Scanning and Verification
4.Quantity Check
5.Standardized Carton Sealing and Stacking
6.Clear and Complete Labeling

Testing Equipment

No. Equipment Name Main Inspection Items Inspection Scope Inspection Accuracy Applicable Products
1 2D Measuring Instrument Dimensional Measurement 450*600mm 0.001mm FPC,Mold
2 Tensile Tester Base Material Peel Strength W=1cm, 0~500KGF/CM 0.01KGF FPC
3 Solder Pot Thermal Shock 300*200mm <288°C - FPC
4 Salt Spray Test Chamber Gold Surface Corrosion Resistance 500*300mm - FPC